FORD WHQ

GANAS was tasked to help refine the design, materials and finishes for the lobby renovation that was designed by HED. Providing wall mock ups and material samples to solidify the final design and material selections. Our engineering team worked directly with Fordland, HED, Devon Industrial Group and Stenco Construction to provide shop drawings and jobsite coordination for the fabrication and installation of the millwork, stone, cabinets, lighting and signage in the project.

    Location

  • Dearborn, MI

    Partners

  • Fordland | Designer
  • HED | Architect
  • DIG | General Contractor